Projects / Plastering training hall

Project · Construction finishing

A training hall of modular rooms for plasterers and finishers

A complete training base for plastering and finishing work. Each learner gets a modular timber-frame room with real wall, corner, window and plinth details, and works on it the way they would on a building site.

Programme

Plasterer and finisher

Scope

Complete training hall

Workstations

1 learner per room

Details

Walls, corners, windows, plinths

Use

Lessons and assessment

The challenge

Real facades are hard to bring into a classroom

Plastering is learned on walls, not on bench samples. A learner has to handle corners, window reveals and plinths, work at height and follow the full layer sequence. A classroom wall can only be rendered once.

01

Every learner needs a full-size wall

Small test panels do not teach how to set out a starter profile, keep a corner straight or finish around a window.

02

Work that can be assessed and repeated

Each result has to be judged on its own, and the base has to be ready again for the next group without rebuilding the room.

The solution

Modular rooms built inside the hall

A row of timber-frame rooms clad in OSB inside the training hall. Each room is a learner’s own building site. When a task is finished and assessed, the finish layers are stripped and the room is ready for the next group.

Planning

Number and size of rooms, aisles, material zones and an instructor station, planned to fit the hall.

Construction

Timber frame with OSB cladding, outside corners, window openings and plinths.

Reuse

Finish layers come off after assessment. The structure stays for the next group.

Precision

Starting right at the base

A facade is only as straight as its starter profile. Learners measure, cut and mitre the profile at the corners of their own room before the first board goes on.

Step 1Starter profile
Step 2Adhesive on insulation boards
Step 3EPS boards fixed and dowelled
Step 4Base coat with fibreglass mesh
Step 5Primer
Step 6Finish render

Materials

Real products, real working conditions

Learners use the same adhesives, boards, profiles and mesh as on site. The aisle between the rooms serves as the material and mixing zone.

Materials zoneBoards, dry mixes, profiles and mesh next to the rooms
Tools and accessWorkbenches, ladders and scaffold for work at height

Openings

Windows and reveals

The window opening in each room teaches the hardest part of facade work: boards cut around the frame, reinforced corners and clean reveals.

AssessmentOne room per learner, graded on its own
CompetitionsAlso used for skills competitions

Gallery

The finished room

Planning a construction training hall?

Send us the hall size and group numbers. We will propose a layout of modular rooms and the equipment to go with it.

Shopping cart

0
image/svg+xml

No products in the cart.

Continue Shopping